The parameters of the solar energy generating station should not be less than the above data. All details and installation processes of the solar photovoltaic power plant must be carried out in accordance with the technical specifications provided by the customer. Solar modules of the latest generation N-type technology, elements: monocrystalline double-sided trina; class - A; Number of cells: 132 cells; Module Dimensions: 2384 x 1303 x 33 mm (93.86 x 51.30 x 1.30 in) Weight: 38.3 (84.4 lbs) Front Glass: 2.0 mm (0.08 in ) heat-strengthened glass (White mesh glass); Filling material: POE/EVA; Back glass: 2.0 mm (0.08 in) heat-strengthened glass (white mesh glass); Frame: 33 mm (1.30 in) anodized aluminum alloy; J-Box: protection level IP 68; Connector: MC4 EV02/TS4* Operating temperature: -40 +85C; Maximum system voltage: 1500 VDC; Maximum series fuse rating: 35 A; Inverter XG100KTR total power 415 kW Max. input voltage: 1100 V Starting voltage: 250 V Rated input voltage: 620 V MPPT controller full load voltage range: 530 V ~ 850 V MPPT controller voltage range: 180 V ~ 1000 V Number of MPPT controllers: 9 MPPT controller circuits: 2 Max. Current for MPRT probe: 26 A Max. Short circuit current for MPRT check: 40A Max. output current: 158.8 A Rated power frequency: 50Hz/60Hz Max. Efficiency: 98.70% European standard efficiency: 98.50% MPPT controller efficiency: 99.90% Display: LED/LCD/WiFi+App Data transmission: Standard: RS485 Optional: WiFi/DRM/Bluetoth Electrical connection standards: IEC61727, IEC621, IEC621 IEC61683, VDE-AR-N 4410:2018, VDE-AR-N4105:2018, VDE-AR-N4120:2018, EN50549, AS/NZS4777.2:2020, CEI0-21, VDE 0116 -0112/ Safety/EMC: IEC 62109-1:2010, IEC 62109-2:2011, EN 61000-2:2005, EN61000-6-3:2007/A1:2011 Dimensions (WxHxD): 1050x36 mm Weight: 1050x36 mm -30C ~ +60C Cooling method: Intelligent cooling Protection class: IP66 Max. working altitude: 4000m Relative humidity: 0~100% Connection diagram: without transformer Night power consumption: <1W, must provide free service in case of production defects within 365 days, online monitoring system and two-way meter must be replaced with a new one. The inverter should not be installed in structures made of flammable materials. In order for the LCD display to be easily read, the inverter should be installed at eye level; For proper air circulation and heat dissipation, it is necessary to provide about 200 mm of free space on the sides of the device and about 300 mm on the top and bottom of the device; For optimal device performance, the ambient temperature should be between 0°C and 55°C. Shield box switch corrugated cable, smart meter. PV and 3-phase AVVG cables for special solar panels (must be included in the electrical part of the construction project). Monitoring for remote control of the station. Additional requirements and characteristics are: grounding, surge protection equipment, low- and high-voltage circuit breakers, and a DC breaker. The above equipment is according to the customer's specifications.